Forty-eight hours previous to the construction, repair or opening of any sidewalk, a notice shall be given the Public Works Director in order that the proper lines and grades may be established. No sidewalk shall be constructed, repaired or opened unless the lines and grades are either determined by or subjected to the inspection or supervision of the Public Works Director, as he or she may direct.
(1991 Code, § 18-19)