(A) All improvements inspected. The owner shall be responsible for having all improvements inspected for compliance with the approved plans, provisions of these regulations and the Street Standards. The owner’s responsibility for inspections extends to sanitary sewer, water lines, all drainage components and other utility installations where they interact with improvements such as subsurface drains or drainage swales.
(B) Owner responsible for testing. The owner shall be responsible for providing all documentation and testing results required by the Street Standards for the improvements including, but not limited to, the following: compaction tests, infiltration/exfiltration tests to sanitary sewers, pressure tests for water lines, material quality and pavement corings if required.
(Ord. 2009-67, passed 3-2-2009)