§ 52.40  INDUSTRIAL PRETREATMENT.
   (A)   SIUs shall provide wastewater treatment as needed to comply with this chapter and shall achieve compliance with all national or state categorical pretreatment standards within the time limitations as specified in the categorical pretreatment regulations. A new source SIU shall install and shall start-up all pollution control equipment required to meet applicable pretreatment standards before beginning to discharge to the POTW. Such new sources shall meet all applicable pretreatment standards and requirements in the shortest time, not to exceed 90 days after the start of discharge to the POTW. An SIU shall provide, operate and maintain any facilities required to pretreat wastewater to meet applicable pretreatment standards.
   (B)   Detailed plans showing the pretreatment facilities and operating procedures shall be submitted
to the Director before construction of the facility for review to determine accessibility and safety of sampling locations throughout the pretreatment facilities. The Director's review of such plans and operating procedures will in no way relieve the SIU from the responsibility of modifying the facility as necessary to produce an effluent meeting the requirements of this chapter and categorical pretreatment standards. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to the Director prior to the SIU's initiation of the changes.
   (C)   At all times SIUs shall properly maintain and operate all control facilities and systems installed or used by the SIU to achieve compliance with this chapter. Such facilities shall at all times be accessible to inspection by the Director.
(Ord. 5746, passed 7-1-2019)