§ 156.11 AS-BUILT REQUIREMENTS.
   Prior to issuance of a certificate of occupancy, recording of the final plat or final release of bond, the as-built condition (including: invert elevations, size, shape and location) of critical storm water features must be identified, approved and provided in a electronic form to the city representative.
   (A)   The volume, slopes, configuration, condition and topographic information of all detention, retention and water quality practices shall be certified by a professional engineer licensed in the commonwealth. This information shall be provided to the city, in the form of an as-built drawing or other electronic form accepted by the city. The as-built certification shall indicate if final conditions are consistent with, or exceed, the goals of the storm water plan.
   (B)   If it is determined that information provided in the as-built drawing, certification, inspection or survey of the site does not meet or exceed the SWQMP provisions, the city reserves the right to withhold certification of occupancy or final bond release. Furthermore, other enforcement mechanisms may be applied to the permittee or persons making certifying statements.
(Ord. 07-2012, passed 4-2-2012)