§ 154.153 LANDSCAPING REQUIREMENTS.
   Unless otherwise provided, landscaping materials shall be installed to provide a minimum of 50% winter opacity and 70% summer opacity between one foot above the finished grade level to the top of the required planting, hedge, fence, wall or earth mound within four years after installation. The required landscaping shall be provided along the property perimeter in designated landscape buffer areas or adjacent to the vehicular use area as required by the zoning regulations. A planting manual and a plant materials list (Appendix A) provides more detailed information on acceptable an unacceptable plant material.
(Ord. 06-2008, passed 6-16-2008, § 5.3)