Development plans shall be required as follows:
(A) For map amendment requests. Exception: If large tracts are involved a preliminary plat may be substituted;
(B) For new construction of a church, school, commercial, institutional or industrial building;
(C) For the enlargement, addition, exterior alteration or extension of a church, school, commercial, institutional or industrial building;
(D) For new construction of multi-family structures of three or more dwelling units on a single lot. This includes the conversion or alteration or addition to existing structures into multi-family units of three or more;
(E) When there is to be more than one principal structure on a lot;
(F) For conditional use permits;
(G) For variances, except when for a single-family or two-family use;
(H) For the conversion of a residential structure to a commercial or industrial use or for a change in use of a commercial or industrial structure when parking, perimeter landscape screening or other similar improvements are required or changed;
(I) For installation of parking areas of five or more spaces;
(K) Exception: For temporary structures, such as tents and fireworks tents, that are erected for less than six months, however, a site sketch with sufficient information to assure that vehicular and pedestrian access are properly maintained may be required by the Department to obtain the required construction permit.
(Ord. 06-2008, passed 6-16-2008, § 3.1; Ord. 10-2014, passed 4-7-2014; Ord. 24-2016, passed 12-19-2016)