(A) The Zoning Administrator or his or her designee shall issue a watershed protection occupancy permit certifying that all requirements of this chapter have been met prior to occupancy or use of a building hereafter erected, altered or moved and/or prior to the change of use of any building or land.
(B) (1) A watershed protection occupancy permit, either for the whole or part of a building, shall be applied for coincident with the application for a watershed protection permit and shall be issued or denied within ten days after the erection or structural alterations of the building.
(2) The building must have received approval by the Building Inspector for compliance with the state’s Building Code prior to issuance of the watershed protection occupancy permit.
(C) When only a change in use of land or existing building occurs, the Watershed Zoning Administrator or his or her designee shall issue a watershed protection occupancy permit certifying that all requirements of this chapter have been met coincident with the watershed protection permit.
(2005 Code, § 30-88) (Ord. passed 12-5-1994)