(A) Each applicant shall submit all calculations and other such information as deemed necessary to demonstrate to the City Engineer the storm water runoff rate and capacity of storm water storage facilities.
(B) Required information may vary according to the size of development, but shall include, but not be limited to, the following:
(1) Map of the property and immediate vicinity showing elevation of contours (based on city datum);
(2) Mapping and description of existing and proposed drainage system features of the property and immediate vicinity;
(3) Physical features of the property and immediate vicinity, including, but not limited to, the state and type of development in the area, public infrastructure and other similar characteristics; and
(4) If the development is to be staged, a plan of how the storm water detention requirement will be met for each stage.