(A) Pavement slab thickness will be determined by at least two cores taken from each lane and at such other locations as the engineer may direct.
(B) (1) Payment will not be made for slabs deficient in thickness by more than one-half inch. If so ordered by the engineer, such slabs shall be removed and replaced at the expense of the contractor with concrete of required thickness which when accepted shall be included in the pay yardage.
(2) Deductions for deficiency in thickness are herewith tabulated:
Proportional Part of | |
Deficiency in Thickness | Contract Price Allowed |
0.00” - 0.25” | 100% |
0.26” - 0.50” | ratio (actual thickness) squared (specified thickness) squared |
greater than 0.5” | None |