If concrete is placed when the weather is such that the temperature of the concrete would exceed 90°F, as determined by the engineer, the contractor shall employ effective means such as precooling of aggregate and mixing water as necessary to maintain the temperature of the concrete as it is placed below 90°F. The contractor shall be entitled to no additional compensation on account of the foregoing requirements.