§ 2.15 PAYMENT.
   (A)   No separate payment will be made for work covered in this part of the specifications except as set forth below. All other related items are incidental to construction. Contract unit prices shall include all costs for each item of work.
   (B)   Sewer pipe in place shall be paid per lineal foot. The unit price shall include the furnishing of pipe, handling, laying, excavation of trench, de-watering, diversion of sewage during construction, connections to sewers and appurtenances, temporary sheeting and shoring, temporary supports of existing utility services, backfill with ordinary backfill, tests and miscellaneous associated work. The length will be measured from beginning point, as shown on the plans, for each size of pipe and type of pipe material along the center line of the pipe with no deductions for manholes or end sections. The length of storm sewer pipe shall be measured between the center lines of connecting manholes and catch basins.
   (C)   Manholes shall be paid per each. The unit price shall include the furnishing, installing, excavating, temporary sheeting and shoring, concrete, frame and cover, connections to sewers, manhole steps, backfill and miscellaneous associated work for standard manholes as provided in standard drawings.
   (D)   Catch basins shall be paid per each. The unit price shall include the furnishing of all labor, material, excavation, backfill, castings, surface restoration and miscellaneous associated work to construct each catch basin as shown on the standard drawing.
   (E)   Y-branches shall be paid per each. The unit price shall include the furnishing of all labor, material, additional excavation, backfill, stopper and stopper restraint required for each Y-branch.