(A) Pavement, sidewalks and/or curb and gutter shall be removed to a minimum of one foot from the trench and undercutting shall not be permitted. Concrete pavement shall be vertically cut with a concrete saw and removed on straight lines approximately parallel or perpendicular to the center line of the pavement. Sidewalks shall be removed to the nearest joint to ensure a minimum of one foot from the edge of the trench. Asphaltic pavement shall be vertically cut with a concrete saw and removed on straight lines approximately parallel or perpendicular to the center line of pavements. Seal coat and gravel surfaces shall be removed with excavating machine.
(B) The contractor shall dispose of the waste material in disposal areas designated by the engineer.