(A) Excavation for manholes and other appurtenances shall be as required to firm undisturbed soil. If the excavation is carried below the bottom of the foundation as shown on the plans, the contractor shall replace the over-excavation with concrete or stabilizing material as directed by the engineer.
(B) When unstable material is encountered which will not provide suitable foundation, fill with concrete or stabilizing material specified hereinafter, as directed.