§ 150.20 PERMIT REQUIRED.
   A permit shall be obtained before beginning construction, alteration, or repair of any building or structure, the cost of which exceeds $500, using forms furnished by the Building Commissioner, and all fees required by this code shal be paid to the Clerk-Treasurer.
(Ord. 1988-4, passed 4-5-88)   Penalty, see §150.99