§ 50.53 FLAT FEE CHARGE.
   (A)   In addition to the sewage treatment plant charge as set forth in § 50.52 and the connection fees described in § 50.60, there shall be a flat fee charge in an amount sufficient to recover the costs of installation and operation of a collection system, sewer tap fees and the cost of billing and collection sewage service charges. The following flat fee charges, with the effective dates of July 1, 2015, for Phase I, and July 1, 2016, for Phase II, shall be based upon the water meter size.
Phase I
Phase II
Sewer Water Meter
Monthly Charge
Monthly Charge
Tap
Size (Inches)
Effective 7-1-15
Effective 7-1-16
Fees
Phase I
Phase II
Sewer Water Meter
Monthly Charge
Monthly Charge
Tap
Size (Inches)
Effective 7-1-15
Effective 7-1-16
Fees
5/8
$13.25
$15.50
$2,000.00
3/4
16.87
19.74
2,000.00
1
24.50
28.67
5,000.00
1-1/4
35.61
41.66
5,000.00
1-1/2
43.24
50.59
5,000.00
2
65.73
76.90
10,000.00
3
118.11
138.19
22,500.00
4
193.10
225.93
22,500.00
6 or larger
380.31
444.96
25,000.00
 
   (B)   (1)   Any municipal sewage works customer that is situated outside the town corporate limits shall be required to pay a monthly fee in the amount of $50. This fee shall be in addition to the flow rate charge of $5.48 for Phase I (effective July 1, 2015), and $6.41 for Phase II (effective July 1, 2016) per 1,000 gallons of sewage discharged as measured by the water meter, the flat fee charge for the cost of installation and operation of the in-town collection system, and the cost of billing and collecting sewage service charges, as provided in this subchapter.
      (2)   Any and all unmetered customers shall be charged a monthly flat rate in the amount of $38.88 for Phase I (effective July 1, 2015), and $45.49 for Phase II (effective July 1, 2016).
   (C)   Extra charges based on the strength of the sewage and liquid wastes shall be made. Refer to § 50.58.
   (D)   Billing for sewage charges shall be made monthly or a period equaling a month.
(Ord. 1984-11, passed 5-11-84; Am. Ord. 1990-6, passed 11-13-90; Am. Ord. 2001-11, passed 8-6-01; Am. Ord. 2003-8, passed 12-29-03; Am. Ord. 2007-7, passed 6-11-07; Am. Ord. 2015-2, passed 5-26-15; Am. Ord. 2020-1, passed 1-27-20)