Sec. 9-1-51 Handling Water Mains and Service Laterals in Excavation Trenches.
Contractors must call Digger's Hotline and ensure a location is done to establish the existence and location of all water mains and service laterals as provided in Sec. 182.0175, Wis. Stats. Where water mains or service laterals have been removed, cut, or damaged during trench excavation, the contractors must, at their own expense, cause them to be replaced or repaired at once. Contractors must not shut off the water service laterals to any customer for a period exceeding six (6) hours.