Sec. 15-3-10 Maintenance Agreement.
   (a)   Maintenance Agreement Required. The maintenance agreement required under Section 15-3-S(b) for st01mwater management practices shall be an agreement between the Village of Edgar and the responsible party to provide for maintenance of stormwater practices beyond the duration period of this permit. The maintenance agreement shall be filed with the County Register of Deeds as a property deed restriction that is binding upon all subsequent owners of the land served by the stormwater management practices.
   (b)   Agreement Provisions. The maintenance agreement shall contain the following information and provisions and be consistent with the maintenance plan required by Section 15-3-9(a)(6):
      (1)   Identification of the stormwater facilities and designation of the drainage area served by the facilities.
      (2)   A schedule for regular maintenance of each aspect of the stormwater management system consistent with the stormwater management plan required under Section 15-3-9(b).
      (3)   Identification of the responsible party, organization or unit of government responsible for long-term maintenance of the stormwater management practices identified in the stormwater management plan required under Section 15-3-9(b).
      (4)   Requirement that the responsible party(s), organization, or city, county, town or village shall maintain stormwater management practices in accordance with the schedule included in Subsection (b)(2).
      (5)   Authorization for the Village Engineer or contractors to access the property to conduct inspections of stormwater management practices as necessary to ascertain that the practices are being maintained and operated in accordance with the agreement.
      (6)   A requirement that the Village Engineer maintain public records of the results of the site inspections, to inform the responsible party responsible for maintenance of the inspection results, and to specifically indicate any corrective actions required to bring the stormwater management practice into proper working condition.
      (7)   Agreement that the party designated under Subsection (b)(3), as responsible for long- term maintenance of the stormwater management practices, shall be notified by the Village of maintenance problems which require correction. The specified corrective actions shall be undertaken within a reasonable timeframe as set by the Village Engineer.
      (8)   Authorization for the Village Engineer to perform the corrected actions identified in the inspection report if the responsible party designated under Subsection (b)(3) does not make the required corrections in the specified time period. The Village of Edgar shall enter the amount due on the tax rolls and collect the money as a special charge against the property pursuant to Subchapter VII of Chapter 66, Wis. Stats.