Sec. 15-2-6 Technical Standards.
The following methods shall be used in designing and maintaining the water quality, peak discharge, infiltration, protective area, and fueling/vehicle maintenance components of storm water practices needed to meet the water quality standards of this Chapter:
   (a)   Design Criteria, Standards and Specifications. All BMPs required to comply with this Chapter shall meet the design criteria, standards and specifications based on any of the following:
      (1)   Applicable design criteria, standards and specifications identified in the Wisconsin Construction Site Best Management Practice Handbook, WDNR Pub. WR-52, Current Revision.
      (2)   Other design guidance and technical standards identified or developed by the Wisconsin Department of Natural Resources under Subchapter V of NR 151, Wis. Adm. Code.
   (b)   Other Standards. Other technical standards not identified or developed in Subsection (a) may be used provided that the methods have been approved by the Village Engineer.