Loading...
Users subject to the reporting requirements of this division shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this division and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the city, or where the user has been specifically notified of a longer retention period by the POTW Director.
(Ord. passed 5-17-94; Am. Ord. passed 11-20-12) Penalty, see §§ 15-185 et seq.
SUBDIVISION F: COMPLIANCE MONITORING
(A) The city requires the user to provide and operate at the user’s own expense, monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility should normally be situated on the user’s premises, but the city may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles.
(B) There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user.
(C) Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with the city’s requirements and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the city.
(Ord. passed 5-17-94) Penalty, see §§ 15-185 et seq.
(A) The city will inspect the facilities of any user to ascertain whether the purpose of this division is being met and all requirements are being complied with. Persons or occupants of premises where wastewater is created or discharged shall allow the city, approval authority and EPA or their representative ready access at all reasonable times to all parts of the premises for the purposes of inspection, sampling, records examination and copying or in the performance of any of their duties.
(B) The city, approval authority and EPA shall have the right to set up on the user’s property such devices as are necessary to conduct sampling, inspection, compliance monitoring and/or metering operations. Where a user has security measures in force which would require proper identification and clearance before entry into their premises, the user shall make necessary arrangements with their security guards so that upon presentation of suitable identification, personnel from the city, approval authority and EPA will be permitted to enter, without delay, for the purposes of performing their specific responsibilities. Denial of the POTW’s. approval authority’s, or EPA’s access to the user’s premises shall be a violation of this division. Unreasonable delays may constitute denial of access.
(Ord. passed 5-17-94; Am. Ord. passed 10-20-09) Penalty, see §§ 15-185 et seq.
If the city, approval authority, or EPA has been refused access to a building, structure, or property, or any part thereof, and is able to demonstrate probable cause to believe that there may be a violation of this division, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program of the city designed to verify compliance with this division or any permit or order issued hereunder, or to protect the overall public health, safety and welfare of the community, then the city, approval authority, or EPA may seek issuance of a search warrant from the District Court of the county.
(Ord. passed 5-17-94; Am. Ord. passed 11-20-12)