(A) The building drain and building sewer as defined in the State Plumbing Code shall be constructed only of cast iron pipe. The grade of pipe, fittings, and size shall meet all requirements of the plumbing code. The system shall be installed according to the plumbing code, and all work shall be performed by a licensed plumber.
(B) Each and every building sewer, as defined in the State Plumbing Code, installed or replaced, wholly or in part, shall have installed a cleanout facility at the end of the lateral installed by the city. Such cleanout shall be a part of the building sewer and shall extend to the finished grade to be readily accessible.
(1989 Code, § 16-107) (Am. Ord. passed 11-20-12)