(A) Any petition submitted for curb and gutter must be for both sides of a street and for an entire block, except that a petition for a length of a street which is for less than an entire block but is for a continuous part of a long block and is for both sides of a length of street not less than 400 feet may be submitted to the City Council for approval.
(B) A petition for both sides of an entire block shall be placed on a construction schedule based on the date the complete and correct petition is submitted.
(C) A petition for less than a block shall be placed on a construction schedule based on the date the complete and correct petition is submitted providing such petition is approved by the City Council.
(1989 Code, § 13-66)
Statutory reference:
Authority to adopt curbcut regulations, see G.S. § 160A-307