§ 53.056  CAPACITY REQUIRED.
   Connection to a public sewer shall not be allowed unless there is capacity available (in both wastewater volume and strength) at the POTW treatment plant and in all downstream sewers, pump stations, interceptors, and force mains including, but not limited to, adequate capacity to accept, treat, and dispose of BOD, TSS, or similar materials as required by applicable local, state, or federal laws, rules, or regulations, as determined by the POTW.
(Ord. 2009-5, passed 7-20-2009)  Penalty, see § 53.999