§ 53.288 ADDITIONAL PRETREATMENT MEASURES.
   The POTW may require users to take additional pretreatment measures, as determined necessary by the POTW including, but not limited to, the following.
   (A)   Whenever deemed necessary, the POTW may require users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage waste streams from industrial waste streams, and such other conditions as may be necessary to protect the POTW and determine the user’s compliance with the requirements of this chapter.
   (B)   The POTW may require any person discharging into the POTW to install and maintain, on their property and at their expense, a suitable storage and flow control facility to ensure equalization of flow.
   (C)   Users with the reasonable potential to discharge explosive or flammable substances may be required to install and maintain an approved explosion hazard meter, combustible gas detection meter, or similar device, as determined appropriate by the POTW.
(Ord. 2009-5, passed 7-20-2009) Penalty, see § 53.999