§ 53.165  COSTS OF MONITORING, SAMPLING, AND ANALYSES.
   All required monitoring, taking of samples, and sample analyses, whether performed by the POTW or by a user including, but not limited to, the costs or fees associated with inspection or surveillance, shall be at the sole cost of the user.
(Ord. 2009-5, passed 7-20-2009)