§ 53.164  SAMPLING METHODS, EQUIPMENT, AND LOCATION.
   (A)   General. A user shall use the sampling methods, sampling equipment, and sampling location specified by the user’s user permit, or, in the absence of a permit, as otherwise required by the POTW Manager.
   (B)   Contaminated groundwater. For discharges to the POTW from remedial actions related to leaking underground storage tanks or other sources of contaminated groundwater, the POTW Manager may require the following analyses or such other analyses as determined appropriate by the Manager:
      (1)   Analysis for benzene, ethylbenzene, toluene, and xylene using the latest methods approved by the EPA;
      (2)   For total petroleum hydrocarbons, samples shall be analyzed according to the latest methods approved by the EPA; and
      (3)   The analysis required will be specific to the type of contamination present at the remedial action site. Parameters requiring analysis may include, but are not limited to, heavy metals, volatile and/or semi-volatile organics, pesticides, polychlorinated biphenyls (PCBs), chlorinated hydrocarbons, phenolic compounds, and polynuclear aromatic hydrocarbons.
(Ord. 2009-5, passed 7-20-2009)  Penalty, see § 53.999