§ 53.089 EXTENSIONS TO BE TESTED PRIOR TO ACCEPTANCE BY COMMISSION.
   Upon completion of construction of any sewer extension, but before final acceptance by the Commission, the sewer system shall be tested for infiltration and exfiltration of both sewer lines and the manholes by approved means and under the direction and inspection of an engineer registered and authorized to practice in the field of sanitary engineering in the state with the presence of the Director. When the sewers have passed tests to demonstrate that they meet the best standards of American workmanship, then the engineer shall certify in writing to the Commission as to the nature of the tests and results thereof, and the fact that the tests meet acceptable standards.
(Ord. passed 3-17-1991; Ord. passed 9-12-1998)