§ 53.037 SIZE, SLOPE, ALIGNMENT AND MATERIALS OF BUILDING SEWER CONSTRUCTION.
   The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the latest requirements of the Connecticut State Building Code, the Public Health Code of the state or the applicable rules and regulations of the town. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in the appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 shall apply. Any deviation from the prescribed procedures and materials must be approved by the Commission before installation.
(Ord. passed 3-17-1991; Ord. passed 9-12-1998)
Editor’s note:
TM Volume 18, page 63; TM Volume 21, page 584