1157.09  TRENCH BACKFILLING.
   All trenches for water lines, sewers, utilities, etc., within the pavement or driveway areas shall be backfilled with granular material and compacted to the satisfaction of the City Engineer to a point within a minimum of six inches of the subgrade and to a point three feet outside the pavement edge or three feet back of the curb, if curb is used.