§ 2.77 INTEGRATED SEWER CONNECTION FEE SCHEDULE.
   (A)   When a property owner or user is requested or required to connect to the system and has not previously paid or been assessed a connection fee, the integrated owner connection fee in place at the time of connection shall apply. The integrated connection fee is due and payable at the time a user receives a permit to connect to the sewer system. A permit issued by the city to connect to the sewer system shall expire 180 days from the date the permit was issued.
   (B)   The user receiving services who applied for a larger water meter than the one presently in service shall pay an integrated connection fee, which is the difference in cost between the meter size in service and the one applied for in accordance with the integrated connection fee in effect at the time of the application. No credit or rebate shall be made the case of application for a smaller meter size.
(Ord. effective 10-12-2018)