§ 57.084 BACKFILL.
   After the concrete has been cured, the spaces along the edges of the sidewalk shall be backfilled to the finished level of the sidewalk with approved topsoil material. The material shall then be compacted until firm and the surface neatly graded to receive grass cover with either seeding or sod.
(Ord. 07-57, passed 12-17-2007)