§ 57.083 CURING.
   (A)   The surface of the newly laid sidewalks shall be cured and protected in a manner as set forth in Article 1020.13 of the State Standard Specifications for Road and Bridge Construction and satisfactory to the Village Engineer or Director of Public Works. The material used for curing shall conform with the concrete curing materials per Section 1022 of the specifications noted previously.
   (B)   Special attention is required for the protection of fresh concrete against cold weather which should follow the measures discussed in Article 1020.13 (c) of State Standard Specifications for Road and Bridge Construction.
   (C)   A minimum of three days curing period is required for all newly constructed concrete sidewalks. All freshly poured, exposed surfaces shall be adequately protected against wash by rain. Traffic shall not be allowed on the sidewalk until the curing period has elapsed.
(Ord. 07-57, passed 12-17-2007)