§ 57.064 HANDLING OF PIPE.
   (A)   All types of pipe shall be handled in such a manner as will prevent damage to the pipe or coating. Damaged pipe, specials and other accessories shall be rejected and replaced to the satisfaction of the village. The methods of handling shall be corrected to prevent further damage when called to the attention of the contractor.
   (B)   Threaded pipe ends shall be protected by caps or other means until laid.
   (C)   The pipe and fittings shall be inspected by the contractor for defects while suspended above grade.
   (D)   Dirt or other foreign material shall be prevented from entering the pipe or pipe joint during handling or laying operations, and any pipe or fitting that has been installed with dirt or foreign material in it shall be removed, cleaned and relaid. At times when pipe laying is not in progress, the open ends of the pipe shall be closed by a water-tight plug or by other means approved by the Village Engineer or Director of Public Works to ensure absolute cleanliness inside the pipe.
(Ord. 07-57, passed 12-17-2007)