11-3-2: NOTICE OF EXCAVATION; DETERMINATION OF NECESSITY; BOND:
   A.   Notice Required; Necessity Determined; Bond Required: Before commencing any excavating, digging or altering on any of the streets or sidewalks in the city referred to in section 11-3-1 of this chapter, the person making or causing said excavating, digging or altering shall first notify the city manager of the type and nature of the excavating, digging or altering, and the city manager, together with the public works director, will determine the possible cost of replacing the street or sidewalk in its original condition; they will then determine the amount of the bond or deposit, or its equivalent to be filed with the city clerk guaranteeing that said street or sidewalk or both will be restored in a manner approved by the city manager. This bond or deposit shall remain in full force and effect for a period of one year unless released and cancelled by the city manager. The excavator or person causing excavation to be made shall post the above bond or deposit with the city clerk before proceeding with any excavation. (Ord., 5-6-1958; amd. 2001 Code)
   B.   Use Of Bond By City: In the event it is necessary for the city to make the proper and necessary repairs to the excavation, the cost thereof shall be paid out of the proceeds of the bond, the deposit, or the equivalent that was filed with the city clerk. (Ord., 5-6-1958; amd. 2001 Code)