§ 1334.10  ALTERNATING ACTIONS.
   (a)   When the city determines that site constraints compromise the intent of this regulation, off-site alternatives may be used that result in an improvement of water quality and a reduction of storm water quantity. Such alternatives shall meet the following standards:
      (1)   Shall achieve the same level of storm water quantity and quality control that would be achieved by the on-site controls required under this regulation; and
      (2)   Implemented in the drainage area of the proposed development project to the maximum extent practicable.
   (b)   Alternative actions may include, but are not limited to, the following. All alternative actions shall be approved by the City Engineer:
      (1)   Fees, in an amount specified by the city to be applied to community-wide storm water management practices;
      (2)   Implementation of off-site storm water management practices and/or the retrofit of an existing practice to increase- quality and quantity control;
      (3)   Stream, floodplain or wetland restoration; and
      (4)   Acquisition or conservation easements on protected open space significantly contributing to storm water control such as wetland complexes.
(Ord. 05-17, passed 3-30-2017)