(A) Calculation of land disturbance should follow the guidelines discussed in § 54.018 and the City Development Criteria/Standards Manual or Stormwater Technical Standards Manual adopted by the Board of Stormwater Management.
(B) The calculation methods as well as the type, sizing, and placement of all stormwater quality management measures, or BMPs, shall meet the design criteria, standards, and specifications outlined in the City Development Criteria/Standards Manual or Stormwater Technical Standards Manual adopted by the City Board of Stormwater Management. The methods and procedures included in these references are in keeping with the above stated policy and meet the requirements of 327 I.A.C. 15-13.
(Prior Code, § 54.038) (Ord. 0-08-0005, passed 3-24-2008) Penalty, see § 54.999