(A) All IUs proposing to connect to the POTW or to discharge sewage, industrial wastes, and other wastes to the POTW shall obtain a wastewater discharge permit before connecting to or discharging to the POTW.
(B) All existing IUs connected to or discharging to the POTW shall be issued a wastewater discharge permit within 180 days after the receipt of the permit application.
(Ord. 18-0017, passed 11-13-2018)