(A) The Commission shall hold the public hearing in accordance with the procedures established in the Plan Commission rules of procedure.
(B) In determining whether to grant primary approval of a plat, the Commission shall determine if the plat or subdivision qualifies for primary approval under the standards prescribed by the subdivision control ordinance. The Commission must make written findings stating whether the plat meets the subdivision ordinance standards regarding:
(1) Minimum width, depth, and area of lots in the subdivision;
(2) Public way widths, grades, curves, and the coordination of subdivision public ways with current and planned public ways; and
(3) The provision and/or extension of water, sewer, and other municipal services.
(C) As a condition of primary approval of a plat, the Commission may specify:
(1) The manner in which public ways shall be laid out, graded, and improved;
(2) A provision for water, sewage, and other utility services;
(3) A provision for lot size, number, and location;
(4) A provision for drainage design; and
(5) A provision for other services as specified in the subdivision control ordinance.
(Prior Code, § 155.092) (Ord. 0-98-0026, passed 12-21-1998)