Where laterals are available, the water works connection charge shall continue to be $250 for all size connections, and the sewer connection charge shall continue to be $500 for all size connections. Where laterals are not available, the connection charges for either water or sewer connections shall be based on the time and material expended in making the connection, and shall include a 10% administrative cost.
(Ord. 3-14-78-1, passed 3-14-1978; Ord. 2010-8, passed 3-9-2010)