(A) Water for building or construction purposes will be furnished by meter measurement only after suitable deposit has been made, the minimum deposit being $25 and the amount to be determined by the city depending upon the size of the construction work contemplated. All water for building or construction purposes, as set forth in the permit, must pass through one and the same meter.
(B) Water so supplied shall be discharged through a hose or pipe directly upon the material to be wet, or into a barrel or other container, and in no case upon the ground or into or through a ditch or trench; and all use of water by other than applicant or use of water for any purpose or upon any premises not so stated or described in the application must be prevented by the applicant, or water service may be discontinued without notice.
(C) Special terms and conditions may be made where water is used by the city or community for public purposes such as fire extinguishment, public parks, and the like.
(Ord. 3-14-78-2, passed 3-14-1978; Ord. 2010-8, passed 3-9-2010) Penalty, see § 50.999