Sec. 10-115.1 Permit for Installation of Erosion and Sediment Control Systems.
Erosion and Sediment Control Plans shall be submitted to the Plan Commission as part of the construction plans and specifications and shall include the following:
   a.   Temporary erosion and sediment control measures necessary prior to and during the initial construction and establishment phases up to final site grading and seeding.
   b.   A permanent erosion and sediment control plan of all the graded and non-hard surface areas within the proposed development, as planned for completion, up to and including seeding of the final lot on which business or residential dwellings are to be place.
   c.   Details concerning removal of temporary erosion control devices after the initial establishment of adequate vegetative cover.
   d.   Maintenance procedures as part of the continuing plan to keep all of the land under adequate cover and erosion at an acceptable minimum.
   e.   All erosion control measures, including, but not limited to, those required to comply with the ordinance, shall meet the design criteria, standards and specifications for erosion control measures similar to or the same as those outlined in the most recent edition of the Indiana Handbook for Erosion Control in Developing Areas.
   f.   No person shall be granted primary plat approval for a parcel of real property having an area of 2,500 or more square feet without the approval of an erosion and sediment control plan by the Town of Dyer Plan Commission.
   g.   Each plan shall bear the name(s) and address(es) of the owner or developer of the site, and of any consulting firm retained by the applicant together with the name of the applicant's principal contact at such firm.
   h.   Each plan shall include a statement that any land clearing, construction, or development involving the movement of earth shall be in accordance with the erosion and sediment control plan.
(Ord. No. 2004-13, § 1, 9-15-04)