Skip to code content (skip section selection)
Compare to:
Sec. 7-65 Electrical Installation.
Electrical installation fees shall be as follows:
Permit cost shall be one hundred dollars ($100.00) for issuance or permit, plus inspection expense as follows:
   (1)   All residential services any size will be at the rate of one dollar ($1.00) per ampere. All commercial and industrial services will be at one dollar ($1.00) per ampere. All three phase services will be at the rate of one dollar and fifteen cents ($1.15) per ampere. (Ord. No. 88-1, § 9 [F][1], 2-2-88; Am. Ord. No. 98-11, § 3, 7-14-98)
   (2)   Temporary pole permit shall be at the rate of twenty-five dollars ($ 25.00) for permit, and twenty-five dollars ($25.00) for one inspection. Reinspection shall be at the rate of fifty dollars ($50.00) per reinspection. In the event a temporary service, other than a temporary pole, is converted to a permanent service, credit shall be given for the cost of the temporary service. (Ord. No. 90-13, § 9 [F][2], 3-13-90; Am. Ord. No. 98-11, § 3, 7-14-98)
   (3)   All room additions, remodels, etc., without a change of service shall be at the rate of twenty-five dollars ($25.00) per inspection.
   (4)   Normal inspections shall consist of one rough and one final inspection. All additional inspections caused by improper installation shall be at the rate of fifty dollars ($50.00) per inspection.
   (5)   Minimum inspection fee shall be twenty-five dollars ($25.00). (Ord. No. 88-1, § 9[F][3]-[5], 2-2-88; Am. Ord. No. 98-11, § 3, 7-14-98)
   (6)   Permit and inspection shall be required for all electrical signs and burglar alarms monitored by the town at the rate of twenty-five dollars ($25.00) per sign or burglar alarm inspection. (Ord.No. 88-11, § 9 [F][6], 3-8-88; Am. Ord. No. 98-11, § 3, 7-14-98)
   (7)   In the event an application for permit shall be made for which the foregoing fee schedule is not applicable, the application shall be reviewed by the inspector and a fair and equitable fee will be determined consistent with the foregoing fee schedule, subject to review by the Town Council at the rate of the electrical inspector or the applicant. (Ord. No. 88-1, § 9 [F][7], 2-2-88)
   (8)   Electrical permit cost for installation or construction of central air conditioning, above ground swimming pool, fireplace, or unattached garage, shall be twenty-five dollars ($25.00); and shall require one inspection at a cost of twenty-five dollars ($25.00). Reinspection, if necessary, shall be at the rate of fifty dollars ($50.00) each.
(Ord. No. 88-29, § 9 [F][8], 5-10-88; Am. Ord. No. 98-11, § 3, 7-14-98; Am. Ord. No. 2008-03, § 1, 3-19-08; Am. Ord. No. 2014015, 11-13-14)