All gas produced during initial testing shall either be sold or flared with the flaring procedures being approved by the Oil and Gas Inspector and the Fire Marshal. Flare equipment should be removed from the well site as soon as practicable.
(Prior Code, § 113.077) (Ord. 1583, passed 1-8-2008)