(A) (1) All fees and charges in effect as of the date of the adoption of the City code for the City shall remain in effect unless otherwise modified by the provisions of this section.
(2) All citations below are to various sections of the City code unless otherwise indicated.
(Prior Code, § 101.01)
(B) The following are the fees and charges for the permits, licenses and services listed below which are referenced to the section of the City code which authorizes their establishment:
(Prior Code, § 101.02)
Land Use Fees | Application Fee | Escrow Fee |
Land Use Fees | Application Fee | Escrow Fee |
Administrative Parcel Combination/Split | $250 | $0 |
Administrative Permit | $50 | |
Annexation Request | $750 | $2,500 |
Appeal of Zoning Administrator Decision | $250 | $500 |
Site Plan/Concept Plan/Sketch Plan Building Plan Review | $600 | $5,000 |
Conditional Use Permit | $500 | $1,000 |
Comprehensive Plan Amendment | $750 | $2,500 |
Environmental Assessment Worksheet | Actual Cost | $5,000 |
Environmental Impact Statement | Actual Cost | $5,000 |
Final Plat | $750 | $1,000 |
Interim Use Permit | $500 | $1,000 |
Lot Combination | $750 | $750 |
Ordinance Amendment (map/rezoning/text) | $750 | $750 |
Planned Unit Development | $750 | $2,500 |
Preliminary Plat | $750 | $2,500 |
R.O.W./Easement/Vacation | $500 | $1,000 |
Variance | $300 | $750 |
Wetland Mitigation Permit | $300 | $2,000 |
Zoning Request Letter | $75 | $0 |
Sewer Trunk Charge: residential/commercial/industrial | $2,700 per acre Minimum $500 |
Water Trunk Charge: residential/commercial/industrial | $2,700 per acre Minimum $500 |
Storm Sewer Utility/Trunk Charge: residential/commercial/industrial | $1,000 per acre Minimum $500 |
Record Drawing/GIS Fee (per lot) residential/commercial/industrial | $90 per lot $250 per acre
|
Water and Sewer Fees | Fee |
Water and Sewer Fees | Fee |
Water Access Connection (WAC) | |
Single family unit | 1": $1,500 |
Multi-family unit | 1": $1,200 |
Commercial/Industrial Formula based on 80% SFD | 1" and larger see formula for change |
For service larger than one inch: ratio of service size to be installed to the area of a one-inch service multiplied by the SFU WAC charge. Example: 3-inch water connection: Area of 3- inch (7.07 sq. in)/area of 1-inch (0.78 sq. in)=Ratio (9.06) Ratio (9.06) x SFU WAC $2,000) = C/I WAC for 3 inch ($18,120) | |
Sanitary Sewer System Connection (SAC) | |
Single family unit | $2,000 |
Multi-family unit | $1,400 |
Commercial/Industrial Formula based on 80% SFD | See formula for charge |
Ratio of SFU SAC charge to SFU WAC charge: multiply by WAC charge as determined by water system connection charge calculation example for 3-inch water connection: SFU SAC charge ($4,000)/SFU WAG charge ($2,000) = ration (2) WAC charge ($18,120 x ratio (2) = C/I SAC (3-inch water) ($36,240) | |
Water Meter | Fee |
Water meter | Actual cost |
Yoke (if required) | Actual cost |
Initial setup | $125 |
Unscheduled meter read | $50 |
Utility Fees | Current Fee | Proposed Fee |
Utility Fees | Current Fee | Proposed Fee |
Water Base Charge: minimum monthly charge includes 1,000 gal. | $24.22 | $24.95 |
Water Rate Charge: charge billed monthly for water over 1,000 gal. | $4.06 | $4.18 |
Water Rate Charge: outside water per 1,000 gal. | $6.18 | $6.37 |
Sewer Base Charge: minimum monthly charge includes 1,000 gal. | $27.94 | $28.78 |
Sewer Base Charge: charge billed monthly for water over 1,000 gal. | $8.93 | $9.20 |
Garbage Monthly Charge plus tax | ||
35-gallon cart | $12.19 + $1.19 | $12.80 + $1.25 |
65- gallon cart | $15.30 + $1.49 | $16.07 + $1.57 |
95-gallon cart | $18.76 + $1.83 | $19.70 + $1.92 |
Storm water fee minimum monthly | $3.50 |
Storm water fee minimum monthly | $3.50 |
Duplicate utility billing | $2/billing |
Late payment fee - monthly on current unpaid utility charges | 10% of unpaid balance |
Certification fee for unpaid utility charges | 10.5% + county charge |
Violation of water use regulation | First offense: written warning Further offenses: $50 per occurrence |
Turn on water fee - reinstating utility services | $75 |
Discharging storm water into sanitary sewer | $100 plus treatment fee for amount of discharge |
Rental charge for use of fire hydrant | $25 per day Water: $10/1,000 gal. Deposit $100
|
Memorial Park Shelter Rental (includes tax)
| |
M-F | $80 |
Saturday or Sunday | $135 |
Damage Deposit | $150 |
Building Permit Fees 1997 Uniform Building Code Fees |
Building Permit Fees 1997 Uniform Building Code Fees | |
Total Valuation | Fee |
$1 to $500 | $23 |
$501 to $2,000 | $23.50 for the first $500 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000 |
$2,001 to $25,000 | $69.25 for the first $2,000 plus $14 for each additional $1,000 or fraction thereof, to and including $25,000 |
$25,001 to $50,000 | $391.25 for first $25,000 plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000 |
$50,001 to $100,000 | $643.75 for first $50,000 plus $7 for each additional $1,000 or fraction thereof, to and including $100,000 |
$100,001 to $500,000 | $993.75 for first $100,000 plus $5.60 for each additional $1,000 or fraction thereof to and including $500,000 |
$500,001 to $1,000,000 | $3,233.75 for first $500,000 plus $4.75 for each additional $1,000 or fraction thereof to and including $1,000,000 |
$1,000,001 and up | $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof |
Paid with Building Permit | Fee |
Landscape/Erosion Escrow | $2,500 |
Other Inspections and Fees:
1. Inspections outside of normal business hours $50 2. Reinspection fees $50 3. Additional plan review required by changes, additions or revisions to plans $50 |
State Surcharge a. Based on valuation of project cost b. Based on a flat fee building permit | 0.0005 x valuation $1.00 |
Building permit refund for cancelled permit | Cost less 50% |
Penalty for working without permit | Double permit fee |
Building permit renewals (work hasn’t commenced within 180 days) | Half original cost |
Demolition permit | $100 fee with escrow based on valuation of demolition
|
Building (residential only) | Fee |
Re-roof | $100 |
Re-side | $100 |
Window replacements - no constructional alterations | $100 |
Door/patio replacement - no constructional alterations | $100 |
Deck | Based on valuation |
All the above include state surcharge fee |
Mechanical/HVAC (residential only) | Fee |
Mechanical/HVAC (residential only) | Fee |
New home HVAC (all inclusive) | $126 |
Factory fireplace | $61 |
Furnace replacement | $61 |
Air conditioner | $61 |
Garage heater | $61 |
Air exchanger | $61 |
Miscellaneous | $61 |
All the above include state surcharge fee | |
Plumbing | Fee |
Plumbing | Fee |
New home plumbing system (all inclusive) | $126 |
Bathroom finish | $61 |
Lawn sprinkler | $61 |
Water heater | $61 |
Water softener | $61 |
Minimum fee | $61 |
All the above include state surcharge fee | |
Commercial and Multi Family Mechanical and Plumbing Permits
| |
Base permit | Contract price x .020 |
Plan review | 65% of base permit fee |
State surcharge | Contract price x .0005 |
Minimum fee | $50 |
Other | Fee |
Other | Fee |
Moving permit (house) | $250 |
Grading/fill permit | $100 Expenses exceeding the permit fee will be billed to the owner/contractor |
Change of occupancy permit - Building Official and/or Building Inspector | $50/hour |
Driveway permit | $100 |
Fence permit | $50 |
Sign permit (new and replacement) | $100 |
Temporary portable sign permit | $25 annually |
Liquor Licenses | Fee |
Liquor Licenses | Fee |
Liquor sale licenses (July 1 through June 30) investigation/background check fee, initial and annual renewal | $125 |
Comprehensive/out-of-state liquor license investigation | Actual, but not to exceed $10,000 |
On-sale intoxicating license | $2,335 annually |
On-sale wine license | $585 annually |
Special Sunday on-sale license | $200 annually |
Off-sale intoxicating license | $200 annually |
On-sale brew pub license | $100 annually |
Temporary on-sale brewer intoxicating license | $50 per event |
Temporary on-sale intoxicating license | $50 per event |
Combination on-sale/off-sale intoxicating license | $2,435 annually |
On-sale culinary class limited license | $100 annually |
Temporary off-sale wine license | $50 per event |
Brewer taproom license | $200 annually |
Temporary small brewer or micro-distillery on-sale | $50 per event |
Micro-distillery cocktail room license | $400 annually |
On-sale 3.2% malt liquor license | $100 annually |
Off-sale 3.2% malt liquor license | $100 annually |
Temporary off-sale malt liquor license | $50 per event |
Penalty for late application | $100 |
Certification from county on property taxes | $10 |
Tobacco License | Fee |
Tobacco license (January 1 through December 31 - includes background check) | $150 initial application $100 annual renewal |
Adult Entertainment | Fee |
Business license | $1,500 |
Manager license | $100 |
Preliminary background | $200 |
Comprehensive background investigation | $1,000 |
Out-of-state comprehensive background | $10,000 |
Dance Licenses | Fee |
Temporary public dance license | $25 per event |
Dance hall license | $500 annually |
Cabaret license | $500 annually |
Tattooing or body piercing services | $500 annually
|
Gambling Permit | Fee |
Background investigation (January 1 through December 31) | $50 annually |
Gambling special permit investigation | $50 per event |
Miscellaneous | Fee |
ATV permit (3-year permit) | $30 |
Golf cart permit (3-year permit) | $30 |
Peddler or transient merchant permit | $125 annually |
Accident/incident reports (Police Dept.) | $5 per report |
Dangerous dog registration fee (M.S. § 347.51 subd. 3) | $250 annually |
Animal release fee | 1st impound: $50 2nd impound: $100 Subsequent: $200 Plus all boarding costs |
Photo copies - black/white | $0.25 per page per side |
Photo copies - color | $0.50 per page per side |
Research time for public information | Per M.S. § 13.03 |
Duplicate city license or permit | $15 |
Election filing fee | $2 |
Special assessment and utility bill search fee per parcel | $30 |
Small cell wireless permit | $300 |
Return/insufficient funds check | $30 or legal maximum + bank fee
|
Equipment | Fee |
Equipment | Fee |
Skid steer | $125/hr includes operator |
Skid steer with grapple | $150/hr includes operator |
Dump truck - 8-yard | $125/hr includes operator |
Dump truck with plow and wing | $200/hr includes operator |
1-ton pick-up truck | $100/hr includes operator |
1-ton pick-up truck with plow | $125/hr includes operator |
Dump trailer (7' x 14') | $90/hr |
Consultant | Fee |
Staff | Loaded cost |
City Attorney | Actual cost |
City Engineer | Actual cost |
City Planner | Actual cost |
(Ord. 2003-01, passed - -; Ord. 2008-01, passed - -; Ord. 2008-04, passed - -; Ord. 2009-01, passed - -; Ord. 2010-10, passed - -; Ord. 2012-02, passed - -; Ord. 2013-04, passed - -; Ord. 2014-06, passed - -; Ord. 2015-02, passed - -; Ord. 2015-04, passed 11-23-2015; Ord. 2016-07, passed 12-12-2016; Ord. 2017-04, passed 11-27-2017; Ord. 2018-07, passed 11-13-2018; Ord. 2019-04, passed 4-8-2019; Ord. 2019-09, passed 11-25-2019; Ord. 2022-01, passed 1-24-2022; Ord. 2022-05, passed 12-12-2022; Ord. 2023-12, passed 12-11-2023)