1183.10 ALTERNATIVE ACTIONS.
   (a)   When the Village determines that site constraints compromise the intent of this regulation, off-site alternatives may be used that result in an improvement of water quality and a reduction of stormwater quantity provide that such alternatives achieve the same level of stormwater quantity and quality control that would be achieved by the on-site controls required under this regulation.
   (b)   Alternative actions may include, but are not limited to the following. All alternative actions shall be approved by the Planning Commission:
      (1)   Fees, in an amount specified by the Village to be applied to community-wide SCMs.
      (2)   Implementation of off-site SCMs and/or the retrofit of an existing practice to increase quality and quantity control.
      (3)   Stream, floodplain, or wetland restoration.
      (4)   Acquisition or conservation easements on protected open space significantly contributing to stormwater control such as wetland complexes.
(Ord. 2019-13. Passed 6-18-19.)