§ 4-2-25 SEWER CUT-OFFS REQUIRED.
   In the case of new construction served by city sewer but not city water, the builder shall be required to install a sewer cutoff prior to connection with the city sewerage system.
(Am. Ord. 14-11, passed 12-8-2014)