§ 52.126 VERTICAL SEPARATION.
   Perimeter drains must extend two feet below the maximum trench depth of the subsurface seepage system used in accordance with a conventional septic and one foot for subsurface seepage field used in accordance with an aerobic treatment unit.
(Ord. passed 11-19-2015)