§ 52.066 ABSORPTION CAPACITY DETERMINED BY SOIL INVESTIGATION.
   The absorption capacity for the design of a subsurface seepage field shall be determined by a soil investigation. A soil investigation shall be performed by a soil classifier or a licensed professional engineer. A copy of the soil investigation must be submitted to the Health Department along with the permit application.
(Ord. passed 11-19-2015)