APPENDIX A: FEE SCHEDULE
   The Town Manager, Town Clerk, Town Engineer, Town Attorney and any other necessary persons are hereby authorized to prepare the agreements, forms and instruments contemplated to be used by the town in implementing the provisions of this Fee Schedule.
Fee Type
Base Fee
Zoning Clearance Fees
Metes and Bounds and Recorded Lots
Fee Type
Base Fee
Zoning Clearance Fees
Metes and Bounds and Recorded Lots
1.   Residential: Site built house; mobile home; duplex; triplex; quad; multi-family; motel w/cooking facilities.
$100 per dwelling unit
   a.   Detached accessory structures, such as courts, pools, garages, water tanks, barns, stables and sheds greater than 400 square feet
$25
   b.   Fences, walls, sheds, 400 square feet or less in size, and extensions to existing detached accessory structures
$15
2.   Residential follow-on (means attached to a primary structure): Attached accessory/additions (including enclosures)
$35
   a.   Remodel
$15
   b.   Slabs, paving, patios, and sheds 400 square feet or less
$15
3.   Nonresidential: noncommercial; motels; camps; commercial; industrial; changes of use; includes slabs, paving, walls, fences, sign supports, permits
$.125 per sq. ft. under roof
   Otherwise, minimum permit
$125
4.   Minimum permit
$15
5.   Permit renewals (within 180 days of original permit)
   a   Single family residential
$10
   b.   Non-single family residential
$50
6.   Revised plot plan
$10
7.   Refunds of zoning clearance fees
   a.   Denied or withdrawn zoning clearance
Retain $10 or 25%, whichever is greater
   b.   Department errors, such as duplicates
$0
8.   Mobile home parks (RV)
$200 plus $10 per space
9.   Commercial permit review fee
$100 (nonrefundable)
10.   Lighting permit
$50
11.   Home occupation
$25
Temporary Dwelling Permits
1.   New
$25
2.   Renewal
$50
3.   Second renewal
See use permit
Sign Permits
Sign Type:
1.   Temporary signs, directional signs (both on- and off-premises)
$10
2.   All on-premises signs intended for advertising regardless of use or size
$60
3.   All off-premises signs (other than directional)
$200
Note: Structures other than purely supports (such as monuments, poles and standards) must be permitted as structures separate from their associated signs with permits under general zoning clearance procedures or have a proven pre-existing legal status.
Hearing Applications to Boards of Adjustment and Appeals
Base Fee (Includes Electronic Document Fee)
1.   Base variance
R: $250/C: $500*
2.   Each additional variance
   a.   BOA appeals (must be separate hearing application)
$400*
   b.   Hearing Officer appeal (payable to Zoning Administrator)
$400*
   c.   Zoning verification letter
$150*
   d.   Minor administrative variance (administrative review)
$85
2.   Conditional use permits
   a.   Residential
$750 plus $10 per acre
   b.   Commercial
$1,000 plus $10 per acre
   c.   Industrial
$1,000 plus $10 per acre
Zoning Map Change (to following district) OR use permit (determined by district in which the requested use would most closely be allowed in as a matter of right)
Base Fee + Multiplier (Includes Electronic Document Fee)
1.   Residential (R1L; RMM; R1; RCU; R2; OS)
$750 plus $20 per acre
2.   Commercial (RCD; RS; PI; C1; C2)
$1,000 plus $50 per acre
3.    Industrial (C3; PM; M1; M2)
$1,000 plus $50 per acre
4.    Planned Area Development (PAD)
$750 plus $20 per acre
5.   Planned Area Development (PAD) Major amendment (P&Z and Town Council hearing required)
$750 plus $10 per acre
6.   Planned Area Development (PAD) Minor amendment (staff review)
$500*
7.    Administrative amendment
$1,000
8.   Density district change ONLY, which results in a decrease in the overall density with no change to the use district
$0
9.   Density district change ONLY, which results in an increase in the overall density with no change to the use district
New application fee for corresponding use district type (i.e., residential, commercial, industrial)
10.   Extension of time for time limited zoning.
Base fee only
11.   Amendment of conditional zoning
Full fee less 25%
12.   UP renewal with NO modifications
Full fee less 50%
13.    UP renewal with modifications
Full fee
14.   UP mobile home/RV park
$700 plus $10 per space
15.   UP home occupation (uses are distinguishable from normal residential uses and do not meet all requirements of the home occupation ordinance)
$300
16.    Administrative UP with comment
$350
17.   UP or conditional zoning amendment
Same as full fee less 25%
Street Names and Addressing
Base Fee + Multiplier (Includes Electronic Document Fee)
1.    Chance existing street name
$250
2.    Change existing address number (per request and not initiated by Yavapai County for 911 purposes)
$250
Wireless Use Permits
Base Fee (Includes Electronic Document Fee)
1.   Applications to be processed by administrative review
$250
2.   Applications to be processed by administrative review with comment period
$350
3.   Applications requiring a use permit
$1,000
4.   Applications to review/renew an existing approved facility
50% of base fee
Final Site Plan
Base Fee (Includes Electronic Document Fee)
1.   Amendment or review requiring a new public hearing
$700*
2.   Amendment or review requiring staff review only
$250
3.   Preliminary site plan review by P&Z and Town Council
$500*
Development Agreements
Base Fee
$1,500
4.   Amendment to approved development agreement
$500
General Plan Amendments (Includes Community Plans)
Base Fee + Multiplier [$50 per acre] (Includes Electronic Document Fee)
1.   Minor
$3,743
2.   Major (heard once per year)
$4,417
Subdivisions
Base Fee + Multiplier (Includes Environmental and Electronic Document Fee)
1.   Sketch plan
$350
2.   Administrative preliminary plat
$350 plus $20 per lot
3.   Preliminary plat
$1,000 plus $10 per lot
4.   Final plat
$750 plus $10 per lot
5.   Record of survey in lieu of subdivision (for 3 lots or less)
$500
6.   Abandonment of a final plat/zoning/reversion to acreage
$750
7.   Extension of time for pre-plat
$500
8.   Administrative consideration of a 6-month extension for final plat recording
$100
9.   Second and any subsequent extension(s) of final plat recording (requiring public hearing)
$500
10.   Traffic report related to platting
Actual cost to review
11.   Drainage report related to platting
Actual cost to review
Base P&Z Commission Review
1.   (Examples: review of miscellaneous applications such as Alternative Financial Assurances; Section Line Setback Waiver and the like)
$500
2.   Site/development plan/lotting layout
$750
Re-advertising — Any Public Hearing
1.   Deferred to date specific
No fee
2.   Deferred to date unspecified; application to be reheard between 0 and 179 days of original hearing date. Requires re-advertising only
$250*
3.   Deferred date unspecified; application to be reheard between 180 and 364 days of original hearing date. Requires re-advertising, posting, and public hearing notices mailed to surrounding property owners
$250*
4.   Deferred date unspecified; application to be reheard 365 days or longer after original hearing date. Requires new application
New full application fee
Annexations
1.   Base fee
$750*
Professional Services
1.   Engineering review - base fee for any of the above
$250 per sheet for first and second reviews, $100 per hour thereafter
2.   Engineer
Actual cost
3.   Planner
Actual cost
4.   Clerical
Actual cost
*Plus direct expenses, i.e., postage, advertising and the like
 
(Ord. 05-09, passed 6-21-2005; Am. Ord. 10-73, passed 8-17-2010; Am. Ord. 11-81, passed 3-15-2011)