§ 155.397 FINAL PLAT REQUIRED.
   The subdivider, having received the approval of the preliminary plat and obtained the necessary signature from the Planning Commission, shall submit the final plat of the subdivision along with the required drawings and specifications if improvements. Such final plat shall incorporate all changes in the preliminary plat as required by the Planning Commission. Otherwise, it shall conform to the preliminary plat, and it shall constitute only that portion of the approved preliminary plat which the subdivider proposes to record and develop at the time. The final plat shall be prepared by a qualified registered engineer.
(Ord. 2317, passed 12-21-2006)