1177.12 UTILITY AND DRAINAGE EASEMENTS.
   (a)   Easements of at least fifteen (15) feet in width centered along rear and/or side lot lines shall be provided for sanitary sewers, gas mains, waterlines, and electric lines or other utilities where it is not practicable to locate said utilities within the road right of way. Easements of greater width may be required along or across lots where necessary for the extension of main sewers or other utilities, where both water and sewer lines are located in the same easement, or where the Commission feels that such widths are necessary to provide adequate access.
   (b)   Whenever any stream or important surface drainage course is located in the area being subdivided, the subdivider shall provide an adequate easement along each side of the stream for the purpose of widening, deepening, relocating, improving or protecting the stream for drainage or recreational use.
(Ord. 95-35. Passed 11-20-95.)